Cleaning Service Repair Service Fiberglass Pools New Plaster Startup Ask About Your Water Gallery Service Area About Reviews Contact 📞 Call (252) 207-6986

New Plaster Startup

Your new plaster is still curing. The first 30 days decide how it looks for years.

A freshly plastered pool looks finished on day one, but the cement in the surface keeps curing for weeks. The water chemistry during that time decides whether the finish comes out smooth and even, or dusty, rough and blotchy.

Balanced water from day one Daily visits the first week New plaster startups Corolla to Nags Head

What is actually happening

Fresh fill water is hungry for calcium, and new plaster is the easiest place to get it.

New fill water is undersaturated. It wants calcium, and it takes it from the most readily available source it can find: the still-soluble calcium hydroxide in the cement of your brand-new surface. Left alone, the water slowly eats into the finish you just paid for.

Plaster dust

As calcium leaves the surface, fine white dust settles on the floor. Left there, it can scratch and etch the new finish.

A pH that keeps climbing

Curing plaster pushes the pH up day after day. High pH clouds the water and leaves scale on the surface and tile.

A rough, blotchy finish

An unbalanced startup can leave uneven color and a rough feel underfoot. Once the plaster has cured that way, it cannot be undone.

How we start up new plaster

Give the water the calcium it wants, so it stops taking it from your plaster.

Our startup balances the water as quickly as possible, then holds it there while the surface cures. Water balance is measured with the LSI (Langelier Saturation Index), and for new plaster we keep it slightly positive.

Acid wash first, not a hot start. There’s more than one way to start up new plaster. We prefer to acid wash the new plaster before the pool is filled, rather than a “hot start,” where acid is added to the fill water to bathe the new surface. Then we fill the pool and balance the water right away.

Fill day

Balance right away

We add calcium and sodium bicarbonate to bring the LSI to +0.20 to +0.30, so the water is no longer pulling calcium from the plaster.

First week

Daily visits and brushing

We visit every day the first week, test and adjust the water, and brush the whole surface to keep plaster dust from settling in.

Weeks 2 to 4

Test, adjust, repeat

New plaster keeps changing the water, so we keep visiting several times a week, brushing as needed and holding the balance until the surface has cured.

Your part

A few simple rules for the first 30 days.

Wait at least a week before swimming No heater for 30 days No pets in the pool for 30 days No wheeled vacuums or automatic cleaners for 30 days (our techs don’t use them either)

Getting a new plaster finish?

Book your 30-day startup before plaster day.

Startup is a separate service from Four Seasons Pool Service OBX, billed separately from the plaster work. Replastering itself is done by our sister company, Four Seasons Pool Builders.

Check Availability Call (252) 207-6986